066 712 6090 info@jwpm.ie
The Kingdom 1765

The Kingdom 1765

The Kingdom 1765

Shortlisted on the 2019 Building Fit Out Awards 

JWPM provided Project Management, Design/Assigned Certifier, Civil/Structural Engineering, Architectural Construction stage and PSDP services for this complete renovation and extension of two protected structures which were amongst the oldest buildings in the town of Killorglin and had been derelict and deteriorated over the years.

The work included creating a new cocktail bar/restaurant on the ground floor including all the associated spaces and 4 apartments on the upper two floors. The layout reconfiguration and structural design were sympathetic to the principles of conservation by aiming to retain as much of the original layouts, walls and intermediate timber floors as possible. This also presented sound, fire proofing and service route issues which were overcome together with specialists in these areas.  We also worked closely with Style So Simple Interior Design to complete the bar/restaurant fit out and the building facades.

Extension and refurbishment to Passive House Enerphit standard

Extension and refurbishment to Passive House Enerphit standard

Extension and refurbishment to Passive House Enerphit standard

An existing two storey farmhouse was refurbished to the passive house Enerphit standard while at the same time given a single storey extension. A passive raft slab was used in the construction of the extension and EPS insulation and Weber render was used on all walls. The existing roof slates were removed and the roof insulated and made airtight from the outside. A new Nibe air to water heat pump was installed to provide hot water and space heating through underfloor heating pipes.

Domestic Home

Domestic Home

Domestic Home

Large detached dwelling overlooking Tralee Bay which was taken from post planning stage through to the completion and handover of the house to the client by JWPM.

Kerry Motorworks

Kerry Motorworks

Kerry Motorworks

Extension and renovation of existing Ford garage. JWPM did a feasibility report on the project and then assembled and managed the design team to get from planning to completion/handover stage. The garage and dealership had to remain operational throughout the whole construction phase.

Baile Mhuire Day Care Centre for the Elderly

Baile Mhuire Day Care Centre for the Elderly

Baile Mhuire Day Care Centre for the Elderly

JWPM assembled and managed the design team to complete this €1.3m facility. The project had to be completed in three phases due to financing arrangements